During building of mobile communication objects “Gervin” LLC executes key ready works according to the EPC contract.
The works in this area are based on the binding of multi-engineering needs of mobile operators with the regulatory framework of the existing permit system, operating in the construction industry in Ukraine.
Optimization of solution approaches: both technical issues and indicators of duration and costs of the works. Only high rates of complex solutions in this area allow the company to keep tender position at the appropriate level, with very intense competition which exists on the telecommunication market.
In this direction, the company organizes the procedure of the land selection and accompanies the development of the project land acquisition:
settles lease contracts with the owners of land or buildings, where it is planned to place base stations, develops the detailed design for the construction projects;
organizes work on the inspection and approvals of project documentation;
organizes work on the obtaining approvals for the construction;
supports the process of construction and electrical works and the process of commissioning of constructed facilities.
carries out the technical inspection with the development of the technical passport for ready built objects. The company participates in the development of the certificate of hygiene facility together with the Laboratory of the Sanitary-Epidemiological Station in Vinnitsa region .
Since 2005 the company has built and put into operation more than 400 objects of mobile communication in Vinnitsa region. More than 200 technical passports were developed for the mobile communication objects, built in the central region of Ukraine.
The enterprise has developed and put into production TU U V.2.6-28.1-21673832-001: 2008 "Tower of cellular communication" Kyivstar ", in unified design solutions that use advanced technical solutions for the optimal design of metal and concrete elements.
In the area of civil and structural design "Gervin" LLC works closely with the State Research and Design Institute of Civil Engineering and the Research Institute of Building Constructions (Kiev). The work is based on the widespread use of modern automated software systems for calculation and design of construction objects such as "All Plan", "Scad" and others.
For the football championship Euro-2012 specialists of the company designed, built with the author's supervision and put into operation the wireless network connection, which provided air interface along the railway between the users and passenger trains and the network.
The length of the line of cordless communication from the western border of Ukraine to Kiev and from Kiev to Donetsk amounted to 680 km, where 127 base stations are located.